pretoria@bigenafrica.com       012 842 8700       Head Office GPS co-ordinates: Lat: -25.74994 | Long: 28.26744
EnglishChinese (Simplified)FrenchPortuguese

Doing good while doing business

Bigen Africa recognises the critical need for power in order to sustain economic and social development in Africa and the rest of the world. The company places great emphasis on the successful delivery of even the largest and most complex bulk electrical services and infrastructure projects.

High Lift Pump Station At Metolong Water Treatment Works, Lesotho

High Lift Pump Station At Metolong Water Treatment Works, Lesotho
Electrification Of Thabaneng In Matatiele Local Municipality (Ward 13 – 2448 Connections)

Electrification Of Thabaneng In Matatiele Local Municipality (Ward 13 – 2448 Connections)

Matthew Substation Intergrated To The Lower Thukela Bulk Water Supply Scheme In Kwa-Zulu Natal

Matthew Substation Intergrated To The Lower Thukela Bulk Water Supply Scheme In Kwa-Zulu Natal

Sawula Substation Being Expanded In Ethopia

Sawula Substation Being Expanded In Ethopia

January 22, 2015 By admin Comments are Off